OCIP and CCIP Wrap-Ups: What Your Safety Data Needs to Prove

November 20, 2026 10 min read

OCIP and CCIP wrap-ups put one insurance program over a whole project, which means one safety record has to stand up for every enrolled trade. When the sponsor carries the deductible, a sloppy sub on floor 12 is everyone's problem. BiltOn is designed for that situation, tying each worker on site to their employer, their orientation, and the safety routines they completed, so the wrap-up file tells the truth. For risk leaders, that record protects margin on the deductible. For safety leaders, it proves field execution and compliance on every enrolled trade.

This guide is for the risk manager who runs the program and the safety director who has to make it work in the field. If you are still building the case for verified data at renewal, start with why carriers are repricing GCs.

OCIP: An owner-controlled insurance program, a centralized program the project owner arranges to cover eligible contractors on a project.

CCIP: A contractor-controlled insurance program, the same structure sponsored by the GC or CM at risk.

Safety Intelligence: Verified field data turned into signals leaders can act on before an incident.

Predictive Safety Management: The operating model that uses verified leading indicators to prevent incidents instead of counting them later.

Total cost of risk: Premium, retained losses, claims handling, downtime, and admin, added together.

What is the difference between an OCIP and a CCIP?

The difference is who sponsors the program and carries its losses. An OCIP is bought by the owner, and a CCIP is bought by the general contractor. Either way, one program covers enrolled contractors, and the sponsor lives with the results.

The International Risk Management Institute defines an OCIP as a centralized program arranged and controlled by the owner to cover eligible contractors and subcontractors on a specific project. Coverage typically includes general liability, workers compensation, and excess liability.

IRMI's 2025 wrap-up best practices guide adds that the entity buying the program becomes the sponsor. A wrap-up administrator handles enrollment, documentation, and compliance with insurance requirements.

Criterion

OCIP

CCIP

Sponsor

Project owner

GC, CM at risk, or prime contractor

Who carries deductible losses

Owner

GC

Who runs enrollment and admin

Owner and administrator

GC and administrator

Why the GC cares about safety data

Owner manuals set the rules

The GC's own money is at stake

Why does safety data matter more on a wrap-up?

Safety data matters more because most wrap-ups are loss sensitive. The sponsor pays losses inside a large deductible, so every claim on every tier lands on one balance sheet instead of being spread across each sub's own carrier.

IRMI's primer on contractor controlled programs puts it bluntly. Because most wrap-ups are loss sensitive, "safety becomes priority number one." The same article notes deductibles in the range of $250,000 to $500,000 and says owners may not want that exposure.

That is the CCIP pitch in a nutshell. GCs argue they control the subcontracting process and the jobsite, so they are best placed to control claims, and they should keep the savings when they do.

Pricing is another reason to care. In WTW's 2026 construction outlook, primary OCIPs and CCIPs were forecast flat to up 10%, and excess liability up 7% to 40%. Carriers price the risk they can see, and a wrap-up with a clean, verified record is easier to see.

What safety requirements do OCIP and CCIP manuals usually include?

Most manuals require a site-specific safety program, orientation for every worker, regular safety meetings, fast incident and claim reporting, and documented return to work. The detail varies, but the theme is the same: every enrolled contractor has to prove it is managing safety.

The Port Authority of New York and New Jersey OCIP manual is a good example. It says a requirement of the OCIP is "a strong commitment to loss control and safety program on the part of all Contractors performing work at the Project site."

The manual then gets specific. It calls for new employee safety orientation, contractor toolbox sessions, supervisor safety meetings, weekly safety walkthroughs, and claims reported within 24 hours of the incident.

Here is what that looks like as a checklist for your trade partners:

  • Before mobilization: Written enrollment confirmation, site-specific safety plan, and orientation records for every worker.

  • Every day: Signed pre-task plans and JHAs tied to the people doing the work.

  • Every week: Toolbox talk attendance, walkthrough findings, and open observations with owners.

  • Within 24 hours: Incident reports routed to the GC, administrator, and carrier.

  • After an injury: Return-to-work notes and modified duty records.

Our pre-task plan template and toolbox talk playbook cover the daily and weekly pieces.

Timeline infographic showing the safety records OCIP and CCIP manuals require from contractors.
The records a wrap-up sponsor expects from every enrolled contractor.

Who is responsible for safety records on a wrap-up?

Every enrolled contractor still owns the safety of its own people, and the sponsor owns the program. Being covered by the wrap-up does not move OSHA recordkeeping, training, or supervision duties off the sub.

IRMI is clear on this point. Even when insured under the wrap-up, a contractor's employee injuries still count against its experience mod and must be recorded on its OSHA 300 log.

OSHA's covered employees rule says you record injuries for employees on your payroll and for workers you supervise day to day. On a multi-tier wrap-up, that means you need to know exactly whose worker got hurt.

Ongoing paperwork matters, too. IRMI lists monthly workers compensation payroll reports, certificates of insurance, endorsements, and incident documentation as continuing requirements. Our guide on certification and COI tracking covers how to stop chasing that by hand. The goal is consistency. Every enrolled contractor should use the same standardized safety workflows, including digital JHAs and PTPs, so the record reads the same on every trade.

Customer proof point: Broadway Construction Group. BCG used BiltOn's verified clock-in and clock-out records to show where workers were on the days they claimed injuries (client-reported). "For many of the days they were claiming, they were either not on that site or they were on another job site," says David Rivera, Director of Operations. BCG case study

How fast do incidents need to be reported on a wrap-up?

Report as fast as you can, because many owner manuals ask for claim reporting within 24 hours and speed changes cost. The first report also sets the facts the whole claim will rely on.

The New York State Workers' Compensation Board says timely reporting has been shown to reduce the costs of a claim and leads to the injured worker returning to work faster.

Recovery time is where wrap-up losses grow. Travelers found construction workers missed an average of 115 days per injury over the past five years, up 14 days from the prior period, according to Construction Executive.

Injury volume is still meaningful. The Bureau of Labor Statistics reported a 2024 nonfatal injury and illness rate of 2.2 cases per 100 full-time construction workers. On a megaproject with thousands of workers, that adds up quickly.

Our guide to incident and near-miss management walks through first-report discipline. The short version is to capture who, where, when, and which sub while the details are fresh.

What are carriers asking wrap-up sponsors to prove now?

Carriers want proof that safety controls run every day across the project, not a binder assembled for the walkthrough. On some New York wrap-ups, that now includes technology the carrier requires as a condition of coverage.

Zurich offers the clearest example. After a three-year pilot, Zurich now requires camera coaching on all construction wrap-up projects it insures in New York, according to Insurance Journal. The pilot compared nine NYC projects using cameras with 12 projects without them and found more than a 50% reduction in claim frequency.

Zurich is also expanding that program beyond New York, according to Business Insurance. The broader point for sponsors is clear. Carriers are rewarding verified, behavior-level data, and they are starting to make it a condition.

That is the same shift we cover in how Safety Intelligence turns jobsite data into lower insurance costs. It is also why a wrap-up record should show leading indicators, not only claims. Real-time compliance data acts like an insurance utility here. Predictive risk monitoring helps you answer carrier questions before renewal, not after a loss.

What the sponsor wants to prove

Field evidence

Why it matters

Every worker was oriented

Orientation records tied to each worker and employer

Shows loss control started at mobilization

Daily work was planned

Signed PTPs and JHAs by trade and tier

Shows controls ran every day

Hazards got closed

Observation close-out times

Shows the program fixes problems

Incidents were reported fast

Timestamped first reports

Supports lower claim costs

Claims match the record

Who was on site, for whom, and when

Supports claims defensibility

Infographic showing how one verified safety record covers every trade and tier on an OCIP or CCIP project.
How a wrap-up sponsor sees safety across every enrolled trade.

How do you build a wrap-up safety record that holds up?

Build it from the field up. Tie every record to a verified worker and employer, capture it when the work happens, and keep it in one place the sponsor, administrator, and carrier can all trust.

Keep the record for the long haul. IRMI recommends keeping wrap-up documentation through the statutory period of repose, because completed operations claims can surface years after the job closes. Our guide on what to keep for OSHA inspections covers retention basics.

BiltOn gives wrap-up teams that single record. Orientations, pre-task plans, permits, observations, and incident reports tie to verified worker profiles, and the records sync to Procore and Autodesk Construction Cloud. The approach behind it is laid out in claims defensibility: building a site record that holds up. Portfolio-wide data standardization helps most when you run wrap-ups across a portfolio. Real-time site visibility and strong field execution keep each record complete.

Customer proof point: Hunter Roberts. Within six months, pre-shift plan completion rose from 67% to 98% across the portfolio, and observation close-out time dropped from 9 days to 4.2 days (client-reported). Hunter Roberts case study

Bar chart of WTW 2026 construction insurance rate forecasts for wrap-ups, workers comp, general liability, and excess.
Where WTW forecast construction insurance rates to move in 2026.

What should each leader own on a wrap-up project?

Each leader owns a piece of the wrap-up record, and the program only performs when all four pieces connect.

  • For VPs of Safety and Safety Directors: Set one daily routine standard for every enrolled trade and track completion by tier. Pair it with construction safety compliance workflows. Keep field execution consistent across every enrolled contractor.

  • For COOs and VPs of Operations: Make enrollment and orientation part of mobilization, so no crew starts work before it is covered and briefed.

  • For CFOs and heads of Risk: Bring leading indicators to the sponsor and carrier, along with loss runs. Our piece on lower workers comp premiums shows how to frame it. Look at portfolio-level risk and margin, not one job at a time.

  • For IT and Innovation leaders: Keep wrap-up records in a system that syncs with Procore or Autodesk, so the field never enters the same data twice.

For megaprojects, also read managing risk on data center megaprojects. Book a walkthrough at BiltOn demo.

Executive takeaway

  • OCIP and CCIP wrap-ups concentrate losses on one sponsor, so one weak trade can cost the whole program.

  • Manuals expect orientation, daily planning, weekly meetings, 24-hour reporting, and return-to-work records from every contractor.

  • Enrolled subs still own OSHA recordkeeping and their own experience, so the record has to show whose worker was where.

  • Carriers are starting to require verified, behavior-level data on wrap-ups, led by Zurich in New York.

  • A single verified record, built from the field up, is what lets the sponsor keep the savings.

  • Use real-time compliance data and consistent, standardized records to protect margin and prove field execution.

Frequently asked questions

1. What is the difference between an OCIP and a CCIP?

An OCIP is arranged and controlled by the project owner. A CCIP is sponsored and controlled by the general contractor or CM at risk. Both cover enrolled contractors under one program, according to IRMI.

2. Do wrap-up injuries count on a subcontractor's OSHA 300 log?

Yes. IRMI notes that injuries to an enrolled contractor's employees still must be recorded on its OSHA 300 log. OSHA's covered employees rule also covers workers you supervise day to day.

3. How quickly should claims be reported on an OCIP?

Many owner manuals set short windows. The Port Authority of New York and New Jersey OCIP manual says claims should be reported within 24 hours of the incident, according to the Port Authority.

4. Why do GCs choose a CCIP?

GCs control the subcontracting process and the jobsite, so they argue they are best placed to control losses and keep the savings, according to IRMI.

5. How does BiltOn support wrap-up projects?

BiltOn ties orientations, pre-task plans, permits, observations, and incident reports to verified workers and their employers. Learn more in Safety Intelligence, explained.

Works Cited

Bureau of Labor Statistics. (2026). Number and rate of nonfatal work injuries and illnesses by industry

Business Insurance. (2026). 2026 U.S. Insurance Awards: Zurich North America, Safety Technology Innovation of the Year

Construction Executive. (2025). The Travelers 2025 Injury Impact Report reveals first-year workers most at risk

Insurance Journal. (2025). Zurich, Arrowsight camera-coaching pilot slashes NYC workers' compensation claims

International Risk Management Institute. (2005). Have you thought about a contractor controlled insurance program?

International Risk Management Institute. (2025). Navigating wrap-up programs in construction: Overcoming challenges with best practices

International Risk Management Institute. (n.d.). Owner-controlled insurance program (OCIP)

New York State Workers' Compensation Board. (2017). Reporting injury and illness: Your responsibilities as an employer

Occupational Safety and Health Administration. (n.d.). 1904.31: Covered employees

Port Authority of New York and New Jersey. (2026). Owner Controlled Insurance Program (OCIP) master manual

WTW. (2025). Insurance Marketplace Realities 2026: Construction

Stay Informed

Get the latest safety intelligence insights.

Join safety leaders and risk professionals who rely on BiltOn's newsletter for industry insights, research, and best practices.

We use cookies

We use cookies to ensure the best experience, analyze traffic and support our marketing. Privacy Policy